E18/12 string concrete pole (263) for Ecorote 2800 turbine. Length 18m, load capacity 12kN. Delivery time up to 5 weeks. Required HIP-E1500-2800-SSB cup.









Introducing the Hipar STR-ZERDZ-WIROWANA-E18-12, a premium pre-stressed concrete column engineered for the Ecorote 2800 turbine. This robust column features a substantial length of 18 meters, providing the necessary height and stability for large-scale wind turbine installations.
Designed with a load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E18-12 ensures exceptional support and durability under challenging conditions. Its strength and reliability make it a crucial component in securing the turbine's operational integrity and safety.
The STR-ZERDZ-WIROWANA-E18-12 has a lead time of up to 5 weeks, which allows for meticulous production and quality assurance. Installation of this column requires the HIP-E1500-2800-SSB socket, which is sold separately and necessary for proper setup.
Choose the Hipar STR-ZERDZ-WIROWANA-E18-12 for a reliable and durable support solution for your Ecorote 2800 turbine. This pre-stressed concrete column delivers outstanding performance and stability, ensuring your wind turbine operates efficiently and safely.