Strain concrete pole E16.5/25 (308) for Ecorote 9800 turbine. Length 16.5m, load capacity 25kN. Delivery time up to 5 weeks. Required Cup HIP-E9800-SSB-KIE









Introducing the Hipar STR-ZERDZ-WIROWANA-E16.5-25, a high-performance pre-stressed concrete column specially designed for the Ecorote 9800 turbine. This column boasts a length of 16.5 meters and a robust load capacity of 25 kN, making it ideal for supporting large-scale wind turbine installations.
Manufactured by Hipar, the STR-ZERDZ-WIROWANA-E16.5-25 is engineered with advanced pre-stressing technology to deliver superior strength and durability. This ensures that the column can reliably support substantial loads and endure challenging environmental conditions, enhancing the stability and performance of your wind turbine.
The STR-ZERDZ-WIROWANA-E16.5-25 comes with a lead time of up to 5 weeks, allowing for careful production and timely delivery. For proper installation, the HIP-E9800-SSB-KIE cup is required and must be purchased separately. This component ensures a secure and stable connection for the column.
Enhance your Ecorote 9800 turbine setup with the Hipar STR-ZERDZ-WIROWANA-E16.5-25. Its impressive length and load capacity, combined with high-quality construction, make it an excellent choice for demanding wind turbine applications.