E16.5/15 String Concrete Pole (263) for Ecorote 5000 Turbine. Length 16.5m, load capacity 15kN. Delivery time up to 5 weeks. Required HIP-E5000-SSB-KIE Cup.









The Hipar STR-ZERDZ-WIROWANA-E16.5-15 is a premium pre-stressed concrete column specially designed for use with the Ecorote 5000 turbine. With a substantial length of 16.5 meters and a robust load capacity of 15 kN, this column is built to ensure the stability and durability needed for large-scale wind turbine installations.
Manufactured by Hipar, the STR-ZERDZ-WIROWANA-E16.5-15 is crafted from high-quality pre-stressed concrete, providing enhanced strength and resilience against harsh environmental conditions. This column is engineered to support the substantial weight and operational stresses of the Ecorote 5000 turbine.
To complete your setup, the HIP-E5000-SSB-KIE cup is required, which must be purchased separately. This essential accessory ensures the secure installation and proper alignment of the pre-stressed concrete column, contributing to the overall stability of your turbine system.
With a lead time of up to 5 weeks, the STR-ZERDZ-WIROWANA-E16.5-15 is an ideal choice for those seeking a reliable and durable solution for their Ecorote 5000 turbine installation, ensuring long-lasting performance and structural integrity.