0
Enquiry KSh 0.00
0
Cart
KSh 0.00
Loading...
Loading...
Enquiries and orders updates!
Enquiries and orders updates! Enquiries and orders updates!
The item is out of stock.
We are sorry but the item is out of stock.

E16.5/12 concrete string pole (263) for Ecorote 2800 turbine. Length 16.5m, load capacity 12kN. Delivery time up to 5 weeks. Required HIP-E1500-2800-SSB cup.

EAN: -
Part number: STR-ZERDZ-WIROWANA-E16,5-12
Please contact us by phone or e-mail in order to determine the details.
Payment methods
Delivery methods

E16.5/12 concrete string pole (263) for Ecorote 2800 turbine. Length 16.5m, load capacity 12kN. Delivery time up to 5 weeks. Required HIP-E1500-2800-SSB cup.

EAN:

-

Part number:

STR-ZERDZ-WIROWANA-E16,5-12

Ideal solutions for your business
We find the optimal solution for your business. Our sales and presales specialists select products and services for our customers every day.
Express delivery of equipment worldwide
We guarantee on-time delivery of your equipment wherever you are. We work with global partners to ensure our logistics are optimised.
Implementation support guaranteed
We offer support in implementing solutions in your business. Our qualified engineers help you manage your infrastructure effectively.
Customer first
Our RMA experts deal with complaints and equipment replacements quickly and efficiently, so that your business can run smoothly.
Description

Introducing the Hipar STR-ZERDZ-WIROWANA-E16.5-12, a high-quality pre-stressed concrete column specifically designed for the Ecorote 2800 turbine. This column features a substantial length of 16.5 meters, providing robust support for large wind turbine installations.

With a strong load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E16.5-12 ensures stability and reliability even in demanding conditions. This column is engineered to offer enhanced durability and performance, making it a critical component for maintaining the integrity of your wind energy system.

The STR-ZERDZ-WIROWANA-E16.5-12 has a lead time of up to 5 weeks, allowing for precise manufacturing and quality control. Installation requires the HIP-E1500-2800-SSB cup, which is sold separately and essential for proper setup.

Opt for the Hipar STR-ZERDZ-WIROWANA-E16.5-12 to secure a reliable and long-lasting support structure for your Ecorote 2800 turbine. This pre-stressed concrete column is designed to deliver exceptional performance and support, ensuring the effective operation of your wind turbine system.

SKU: 1748484
Stay in touch!
Join our newsletter and stay up to date with our promotions and news.

By clicking "Subscribe" you agree to receive marketing information at your e-mail address. Your personal data will be administered by Senetic SA with its registered office in ul. Przewozowa 32, 44-100 Gliwice, Poland. You have the right to demand access to personal data and to rectify, erase or limit the processing, as well as to object to the processing. Detailed information on the processing of personal data can be found in the privacy policy.

Incorrect e-mail address
This e-mail address has already been confirmed.
This e-mail address has not been confirmed yet.
Thank you!
Check your inbox - you will receive a message from us asking you to confirm your subscription to the newsletter.
Payment methods
Delivery methods
Certificates and awards