E16.5/12 concrete string pole (263) for Ecorote 2800 turbine. Length 16.5m, load capacity 12kN. Delivery time up to 5 weeks. Required HIP-E1500-2800-SSB cup.









Introducing the Hipar STR-ZERDZ-WIROWANA-E16.5-12, a high-quality pre-stressed concrete column specifically designed for the Ecorote 2800 turbine. This column features a substantial length of 16.5 meters, providing robust support for large wind turbine installations.
With a strong load capacity of 12 kN, the STR-ZERDZ-WIROWANA-E16.5-12 ensures stability and reliability even in demanding conditions. This column is engineered to offer enhanced durability and performance, making it a critical component for maintaining the integrity of your wind energy system.
The STR-ZERDZ-WIROWANA-E16.5-12 has a lead time of up to 5 weeks, allowing for precise manufacturing and quality control. Installation requires the HIP-E1500-2800-SSB cup, which is sold separately and essential for proper setup.
Opt for the Hipar STR-ZERDZ-WIROWANA-E16.5-12 to secure a reliable and long-lasting support structure for your Ecorote 2800 turbine. This pre-stressed concrete column is designed to deliver exceptional performance and support, ensuring the effective operation of your wind turbine system.