Strain concrete pole E13.5/15 (263) for Ecorote 5000 turbine. Length 13.5m, load capacity 15kN. Delivery time up to 5 weeks. Required Cup HIP-E5000-SSB-KIE









The Hipar STR-ZERDZ-WIROWANA-E13,5-15 is a premium pre-stressed concrete column designed for use with the Ecorote 5000 turbine. With a length of 13.5 meters and a robust load capacity of 15 kN, this column is engineered to provide the strength and stability needed for large-scale wind turbine installations.
Crafted by Hipar, the STR-ZERDZ-WIROWANA-E13,5-15 column is made from high-quality pre-stressed concrete, ensuring exceptional durability and resistance to mechanical stress and environmental conditions. This makes it a reliable choice for supporting your Ecorote 5000 turbine in various settings.
For installation, the HIP-E5000-SSB-KIE cup is required, which is sold separately. This accessory is crucial for the proper mounting of the pre-stressed concrete column, ensuring a secure and stable setup for the turbine.
With a lead time of up to 5 weeks, the STR-ZERDZ-WIROWANA-E13,5-15 offers a combination of strength and reliability. Its design and load capacity make it an essential component for achieving optimal performance and stability in your Ecorote 5000 turbine system.